Use this checklist before signing off on a standby-generator installation.
Before You Buy
- Define essential vs whole-home loads
- Perform load calculation
- Confirm fuel type
- Check natural-gas meter or propane capacity
- Choose generator size
- Choose transfer-switch strategy
- Decide whether load management is needed
Site Selection
- Confirm manufacturer clearances
- Check distance from windows
- Check distance from doors
- Check fresh-air intakes
- Check AC equipment clearances
- Confirm service access
- Confirm drainage
- Check flood risk
- Check property-line/HOA restrictions
Pad / Base
- Confirm approved base type
- Level site
- Confirm drainage
- Confirm anchoring requirements
- Confirm wind/flood requirements
Electrical
- Confirm service amperage
- Confirm panel/service condition
- Select correct ATS
- Size generator conductors
- Confirm disconnect/breaker
- Confirm grounding/bonding
- Install control wiring
- Confirm utility sensing
- Confirm battery-charger circuit
Fuel
Natural Gas
- Confirm generator full-load demand
- Confirm meter capacity
- Confirm regulator capacity
- Size gas pipe
- Confirm shutoff
- Pressure-test as required
Propane
- Confirm tank size
- Confirm vaporization capacity
- Confirm regulator
- Confirm line sizing
- Confirm initial fill
Permits
- Electrical permit
- Gas/plumbing permit if required
- Mechanical/building permit if required
- HOA approval if required
- Utility approval if required
Installation Day
- Generator placed level
- ATS installed
- Electrical connected
- Fuel connected
- Battery installed
- Controller configured
- Generator in AUTO
- Exercise schedule configured
Commissioning
- Generator starts
- No active alarms
- Simulated outage performed
- ATS transfers to generator
- House receives power
- Major loads tested
- Load management verified
- Utility restoration tested
- ATS transfers back
- Generator cools down and stops
Inspection / Handover
- Final inspections passed
- Permits closed
- Model/serial documented
- Warranty registered if applicable
- Maintenance schedule explained
- Dealer/service contact saved
- Owner understands AUTO/OFF
- Owner knows generator breaker location
Quote Checklist
Before signing, confirm the quote includes:
- Generator
- Transfer switch
- Pad
- Electrical work
- Fuel work
- Trenching
- Permits
- Load management
- Startup/testing
- Cleanup
- Warranty/registration
Bottom Line
A standby installation is complete only when the entire system works:
fuel + engine + electrical + transfer + house load + automatic operation
Do not accept "the generator starts" as final commissioning.
Read generator installation process →