Three ways to plan your loads

Approach What to put in the proposal What to confirm
Essential circuits A named list of supported circuits Whether omitted appliances matter during an outage
Managed loads Each controlled appliance and its priority Recovery delays, compatibility and behavior during overload
Simultaneous operation The intended combination of loads Running demand and motor starts on the selected fuel

Start with the sizing guide and calculator. Make two lists: appliances you need continuously available and appliances you can postpone. Your installer should convert those preferences into a verified load plan.

A manufacturer example

Generac’s 50A Smart Management Module manual describes priority settings that control the order in which loads return after a shedding event. It also describes a lockout option for keeping a load off generator power. Those settings belong to that equipment; they are not universal behavior for every brand or controller. Generac SMM manual.

Build a priority worksheet

Load Your preference Installer to document
Refrigerator and lighting Maintain availability Circuit assignment and combined demand
Heating or cooling Discuss comfort and temperature needs Starting demand, controls and restart behavior
Well pump Discuss water requirements Voltage and motor-start requirements
Water heater, dryer or EV charging Identify what can wait Whether manually postponed or automatically controlled

This is a discussion worksheet, not a recommended priority order for every household. Tell the installer about any equipment that cannot tolerate interruption; do not assume a managed circuit can serve it.

Compare management with a larger generator

Request two itemized proposals: one for the agreed managed-load plan and one for the required simultaneous loads. Compare generator size, fuel supply changes, controls, installation and ongoing service. Include the practical cost of appliances being temporarily unavailable.

Ask for a commissioning demonstration that matches the written plan. Keep a copy showing each managed appliance, its priority and the expected recovery behavior. Use the quote checklist to record the difference between proposals.

Does load management reduce starting demand?

It changes which loads are allowed to operate together. A compressor soft starter addresses a different question: the compressor’s startup behavior. Read the soft-start guide before treating the two as interchangeable.

What should a managed-load demonstration show?

A managed-load demonstration should show which loads are deferred, what triggers the decision and how power returns to those loads. Ask what happens when a compressor restarts while another large load is active. Include that sequence in the commissioning checklist so the operating plan can be checked.